Object:Jack up drilling rig – Living quarter construction
Location: Kuryk (Oblast Mangystau) KZ
Year: 2014 – 2015
Client: Renco Spa
Final Client: KazMunayGaz
Project description
JUDR project consists in the construction of a new Jack Up Drilling Rig to be deployed in the Caspian Sea. The contract was awarded by a JV between Keppel-Fels (Singapore) and ERSAI (Kazakh joint venture of ERC Holdings (Kazakhstan) and Saipem (Italy)). Kappel-fels took care of project Engineering while ERSAI took care of the construction in Kuryk Yard.
Trillini Engineering Scope of Work can be resumed in the following steps:
- On-site Construction assistance on behalf of Renco Spa (subcontractor for Living Quarter construction) with respect to the following disciplines:
- Civil/Architectural
- HVAC/Piping
- E&I
- Site Engineering activities such as as-built drawings, construction shop-drawings (when missing), clashes analysis (Electrical/Piping/Process); study, evaluation and solving of construction problems.
- Material requisition in order to guarantee on-site availability of materials required during the different phases of the construction. Procurement assistance to identify suitable supplier from local and non local market.
- Interface towards ERSAI/KFELS, the final customer (KazMunayGaz) and the certification third party (ABS) in order to identify shared solutions to solve installation problems (TQ/CR) and to validate approved exception to design specifications.
- Quality Assurance assistance
5 Specialists from Trillini-Engineering were involved since the early construction phase till the Mechanical Completion phase.
Characteristics
- Operating temperature: -10°C ÷ +30°C
- RH: 60% with marine environment
- Internal and external pressurization
- ATEX areas
- A60/Gastight walls
- HVAC for Living quarter/LER/Process rooms
- Temporary Refuge classified areas