Project: North Field Bravo (NFB) Offshore Accomodation Expansion Project
Location: Qatar
Date: June 2017 – Sept 2018
Direct customer: Basis Engineering S.p.a
End customer: QatarGas Operating Compani Ltd.
Industry: Oil&Gas
Project details:
Design Engineering of the HVAC system relating the whole New Living quarter platform with the relative Material requisition and vendors follow-up.
The Scope includes the production of basic HVAC documents (calculation reports, P&Ids, BOQs, layouts…) and the relative Equipment datasheets and material requisitions. We were involved also in the bid evaluation phase and the post order engineering follow up for main and loose equipment.
Trillini was also involved in a site survey requested for the revamping of part of the existing LQ.
The project was based on Shell DEP Offshore specifications with very high quality standards for what concern engineering and material supply.
Trillini staff, composed by n. 4 senior HVAC Specialists, has been able to complete the SOW in time and in fully compliance with project specifications.