Project Description

JACK UP DRILLING RIG – LIVING QUARTER CONSTRUCTION

OBJECTIVES

JUDR project consists in the construction of a new Jack Up Drilling Rig to be deployed in the Caspian Sea. The contract was awarded by a JV between Keppel-Fels (Singapore) and ERSAI (Kazakh joint venture of ERC Holdings (Kazakhstan) and Saipem (Italy)). Kappel-fels took care of project Engineering while ERSAI took care of the construction in Kuryk Yard.

Sector: Oil&Gas
Year: 2014 – 2015
Location: Kuryk, Oblast Mangystau, KZ
Direct client: Renco Spa
Final client: KazMunayGaz

MAIN ACTIVITIES AND SOLUTIONS

Trillini Engineering scope’s of work can be resumed in the following steps:

    1. On-site Construction assistance on behalf of Renco Spa (subcontractor for Living Quarter construction) with respect to the following disciplines:
      • Civil/Architectural;
      • HVAC/Piping;
      • E&I.

Five Specialists from Trillini-Engineering were involved since the early construction phase till the Mechanical Completion phase.

  1. Site Engineering activities such as as-built drawings, construction shop-drawings (when missing), clashes analysis (Electrical/Piping/Process); study, evaluation and solving of construction problems.
  2. Material requisition in order to guarantee on-site availability of materials required during the different phases of the construction. Procurement assistance to identify suitable supplier from local and non local market.
  3. Interface towards ERSAI/KFELS, the final customer (KazMunayGaz) and the certification third party (ABS) in order to identify shared solutions to solve installation problems (TQ/CR) and to validate approved exception to design specifications.
  4. Quality Assurance assistance.

Characteristics:

  • Operating temperature: -10°C ÷ +30°C;
  • RH: 60% with marine environment;
  • Internal and external pressurization;
  • ATEX areas;
  • A60/Gastight walls;
  • HVAC for Living quarter/LER/Process rooms;
  • Temporary Refuge classified areas.